2021 House Roof Removed
|
![]() The old roof tiles were removed, starting at the crown and working one's way down from there.
2021 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() A man on the roof was one of two men stripping tiles and nails from the old roof.
2021 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() The old moisture barrier was underlayment of the old roof. Pieces of it fell from the roof onto a protective tarp below. Sadly some of the pieces landed on the patio and garden.
2021 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() A view looking up at one of the inside skylights. Pieces of underlayment also landed atop the skylight.
2021 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() A piece of the old moisture barrier flew off the roof in the wind. It left behind a party stripped roof.
2021 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() The ladder used to access the roof was laid down next to our brush pile. It would be set up again when they returned to work on Monday.
2021 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() Packages of tiles were stacked atop the crown of the roof. That section of roof was covered with the new moisture barrier.
2021 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() |