|
|
|
|
2017, Construction, Of Piers F and G, San Francisco, California
|
|
![]() Steel pilings were driven deep through silt and down into bedrock. The pilings would someday support a new walkway between ferry docks.
Construction
#C17_5552
Add a comment or report a mistake
|
|
![]() A floating crane lifted steel pilings off a barge and set them up to be driven into the ground.
Construction
#C17_5553
Add a comment or report a mistake
|
|
![]() A second crane rested near shore and held aloft the pile driver that pounded the pilings into the ground.
Construction
#C17_5554
Add a comment or report a mistake
|
|
![]() A group of men helped locate the pile in its precise location so it could be pounded into the ground.
Construction
#C17_5555
Add a comment or report a mistake
|
|
![]() The piles being driven into the ground were very tall.
Construction
#C17_5556
Add a comment or report a mistake
|
|
![]() A sign was hung from the cyclone fence. It showed an image of what the new piers would look like when done.
Construction
#C17_5557
Add a comment or report a mistake
|
|
![]() The piles would become the support for a new plaza between The Embarcadero and the new piers.
Construction
#C17_5560
Add a comment or report a mistake
|
|
![]() A view of the new construction with the Ferry Building behind.
Construction
#C17_5563
Add a comment or report a mistake
|
![]() |
| home • contact • topic guide • top 25 • photos • video • writing • blogs • upload • terms • privacy |