![]() |
![]() |
![]() |
2018, Construction, Of Piers F and G, San Francisco, California
|
![]() Concrete walkways had been installed and extended out over old-looking fresh pilings.
2018 Construction ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() Two barges were tied up a short distance away, filled with construction supplies for the new piers.
2018 Construction ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() Steel uprights had been installed atop pilings. Those uprights form the under support for the new plaza.
2018 Construction ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() The two new piers, as they appeared under mid-construction, while waiting for the Oakland/Alameda Ferry on Pier E.
2018 Construction ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() Pier F and the walkway connecting it to Pier G as seen from the Oakland/Alameda Ferry just beginning its trip across the bay.
2018 Construction ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() Pier G under construction with pier 14 behind and to the left, and the Embarcadero along the waterfront behind both piers.
2018 Construction ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() |
home • contact • topic guide • top 25 • photos • video • writing • blogs • upload • terms • privacy |