EMX BRT Construction, For The Lane Transit District (LTD)
|
|
![]() The sidewalk along Charnelton Street was torn up so that a new BRT station could be constructed.
EMX
#C15_1069
Add a comment or report a mistake
|
|
![]() Rebar was being installed in the dug out portion of a sidewalk so that a new station could be installed.
EMX
#C15_1070
Add a comment or report a mistake
|
|
![]() All of Charnelton Street was re-paved in concrete because this is where both directions of the new EMX 11th Avenue extension will run. It connects 11th Avenue to 6th and 7th Avenues.
EMX
#C15_1071
Add a comment or report a mistake
|
![]() |