![]() |
![]() |
![]() |
4th Street Construction, Central Subway, SFMTA MUNI Metro, Third Street Extension, San Francisco, California
|
![]() The center of 4th street was dug up to prepare for concrete and rail tracks. This project extended from the start of the subway under the freeway, to the Caltrain Station.
4th Street Construction • Central Subway ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() A small piece of construction equipment was parked at the Harrison Street end of one dug up portion.
4th Street Construction • Central Subway ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() At the this time, construction was only between cross streets. The cross streets would be closed later to run tracks across them.
4th Street Construction • Central Subway ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() This was a large construction project, for merely connecting the subway to the T-line. This view was from Townsend Street with the end of construction at King Street a block behind.
4th Street Construction • Central Subway ![]() ![]() ![]() ![]() ![]() ![]() Add a comment or report a mistake
|
![]() |
home • contact • topic guide • top 25 • photos • video • writing • blogs • upload • terms • privacy |